top of page
by Market
Residential
Residential
Residential
Overall Building looking at Pre-School Entrance
Underground Detention Pond
Building Elevation at Night
Overall Building looking at Pre-School Entrance
1/8
DULUTH, GA
KOREAN CHURCH OF ATLANTA
41,164 sqft
2010
for KCAUMC
by Yoon Architects + Knoll Construction
Added new main sanctuary building next to the existing church. Designed by Yoon Architect, the project has a pre-school facility with 20 classrooms and 3 large multi-purpose rooms at level 1, and a main worship hall at the level 2. Knoll Construction was a G.C. and DJS worked as a field superintendent, operating the job site daily.
bottom of page